#DesignYourFuture

Superior
-Dismantling.
-Waste Bin.
-Internal Doors x 4.
-New Kitchen Workspace (8 meters maximum length).
-Range Hood – Sink – Battery .
-New Kitchen and Bathroom Plumbing Installation.
-New Sanitary Appliances.
-Wardrobe (7m2 maximum).
-New Electrical Installation.
-Safety Door.
-Laminated or Tiled Floor Installation.
-Full Internal Painting.
-Electrical Outlet Replacement.
-External window frames
-Heaters
- Total 32.500€.
- 60-70 m2 Maximum Home Size.
- Construction Time 45-50 days.