#DesignYourFuture

Standard
-Dismantling.
-Waste Bin.
-Internal Doors x3.
-New Kitchen Workspace (8 meters maximum length).
-New Kitchen Plumbing Installation.
-Wardrobe (7m2 maximum).
-Safety Door.
-Laminated or Tiled Floor Installation.
-Full Internal Painting.
-Electrical Outlet Replacement.
-Electrical Installation Checkup.
- Total 12.500€.
- 50-60 m2 Maximum Home Size.
- Construction Time 25-30 days.