GM constructions

Basic - 6.200€

#DesignYourFuture

Basic

-Dismantling.

-Waste Bin.

-Internal Doors x2.

-New Kitchen Workspace (6 meters maximum length).

-Full Internal Painting.

-Electrical Outlet Replacement.

-Electrical Installation Checkup.

-Plumbing Installation Checkup.

  • Total 6.200€.
  • 40-45 m2 Maximum Home Size.
  • Construction Time 15-20 days.
(Prices do not include V.A.T.)
(All plans include a 3-5 year written warranty)
(All construction is overseen by our Civil Engineer)