GM constructions

Superior - 32.500€

#DesignYourFuture

Superior

-Dismantling.

-Waste Bin.

-Internal Doors x 4.

-New Kitchen Workspace (8 meters maximum length).

-Range Hood – Sink – Battery .

-New Kitchen and Bathroom Plumbing Installation.

-New Sanitary Appliances.

-Wardrobe (7m2 maximum).

-New Electrical Installation.

-Safety Door.

-Laminated or Tiled Floor Installation.

-Full Internal Painting.

-Electrical Outlet Replacement.

-External window frames

-Heaters

  • Total 32.500€.
  • 60-70 m2 Maximum Home Size.
  • Construction Time 45-50 days.
(Prices do not include V.A.T.)
(All plans include a 3-5 year written warranty)
(All construction is overseen by our Civil Engineer)