GM constructions

Standard - 7800€

#DesignYourFuture

Standard

-Dismantling.

-Waste Bin.

-Internal Doors x3.

-New Kitchen Workspace (8 meters maximum length).

-New Kitchen Plumbing Installation.

-Wardrobe (7m2 maximum).

-Safety Door.

-Laminated or Tiled Floor Installation.

-Full Internal Painting.

-Electrical Outlet Replacement.

-Electrical Installation Checkup.

  • Total 7.800€.
  • 50-65 m2 Maximum Home Size.
  • Construction Time 25-30 days.
(Prices do not include V.A.T.)
(All plans include a 3-5 year written guarantee)
(Construction is always overseen by our Civil Engineer)